Search

Find a publication or report using the form below.

Sort by:

Phase III WIPs Fact Sheet

Watershed Implementation Plans (WIPs) are developed by the seven Chesapeake Bay watershed jurisdictions to help guide their actions as they work to meet the pollution reduction goals outlined in the Chesapeake Bay Total Maximum Daily Load (Bay TMDL) by 2025. These plans consider such things as ecological restoration and sustainability while allowing for greater transparency and accountability for improved performance. Each Bay jurisdiction is currently developing its third WIP (Phase III) since the Bay TMDL was established in 2010. Phase III WIPs are expected to include the specific steps that each of the seven jurisdictions intends to implement between 2019 and 2025 to meet Bay restoration goals.

Download publication

View details